Hazard Analysis Critical Control Point Process UPDATED MARCH 2017

Unload garments at dock 2

DESCRIPTION Garments are removed from route trucks or relays and moved to garment soil sorting area.

POTENTIAL HAZARDS

Physical Hazards „ „ Soiled garments „ „ Vehicle properly aligned with dock

CONTROLS „ „ Cart repair identification

„ „ Relay truck unloading „ „ Route truck unloading „ „ Auditing of routes „ „ Proper Personal Protective Equipment (PPE) PREVENTATIVE MAINTENANCE (per internal standard operating practices) „ „ Monthly Sonic Aire delinting

Microbial Hazards „ „ Soiled garments

Chemical Hazards „ „ None

VALIDATION „ „ Auditing of Routes (Dock Auditor)

„ „ ISO 14001-2004 employee training matrix „ „ ISO 14001-2004 certification of registration „ „ Scheduled internal HACCP audit „ „ Scheduled external HACCP audit with chemical vendor - ECOLAB